Company:

The Euclid Chemical Company

Project:

Rialto FedEx Facilities

Location:

Rialto, California

FedEx needed to build new facilities that would provide the fastest transit times across the United States. Tuf-Strand SF reinforcing fibers were specified for use in the facilities’ new construction floor slabs.

Engineer HAS & Associates Inc. and concrete contractor Darco Construction collaborated with D&K Concrete Floors Inc. and Robertson’s Ready Mix to construct a 303,000-square-foot FedEx facility in Rialto, California. Tuf Strand SF was utilized at a dosage rate of 5lbs/yd3 to reinforce the facility’s interior warehouse floor and loading dock. This resulted in increased durability and reduced long-term floor maintenance costs.