Company:

FORTA Corporation

Project:

GALOT Motorsports Dragstrip

Location:

Benson, North Carolina

The GALOT Motorsports Park needed to replace its deteriorated 60- x 840-foot dragstrip racetrack. As a high-speed racing application, slab flatness and minimal conventional joints were paramount.

To maximize slab flatness and minimize resulting joints, concrete contractor American Concrete Construction Inc. turned to FORTA-FERRO high-volume macro synthetic fibers as a better-performing and more cost-effective alternative to conventional reinforcement.